IoT Hybrid SolutionsKeeping you Connected
All insights
Update

Shop Drawings and As-Builts Are a Line Item in Our Quotes

Why we price CAD time for shop drawings and as-builts on its own line in access control and video proposals, and what it means for the owner at closeout.

By IoT Hybrid Solutions

Access ControlVideo SurveillanceEstimating
Shop Drawings and As-Builts Are a Line Item in Our Quotes

On a recent access control and video proposal, one of the last lines we added before release was CAD time for shop drawings and as-builts.

It is easy to treat drawings as overhead that gets absorbed somewhere. We price them on their own line instead. Here is why.

Many Division 28 specifications list shop drawings as a required submittal: floor plans showing device locations, cable routes, cable types and quantities.

Closeout usually calls for record drawings that show what was actually installed, not what was designed. Some owner specs ask for cable IDs and MAC addresses on the as-builts, and a few want them submitted before cutover is approved.

That is real time from someone who knows the system. If it is not in the quote, it gets rushed at the end or skipped.

A separate line also shows the owner exactly what documentation they are paying for, and leaves their facilities team with drawings they can actually maintain the system from.

If your bid leveling sheet has no line for drawings, ask where that work lives.

Talk to an engineer

Short call, quick requirements pass, and a recommended next step you can act on.

Contact us
IoT Hybrid Solutions LLC | 11400 Airport Rd Suite 200, Everett, WA 98204 | (425) 287-6866 | service@ioths.ai | ioths.ai